Have you have found a house on a large block that is a great investment opportunity?
Develop your property to its full potential.
At Weeks Peacock Quality Homes we can guide you through the whole process, from designing a concept that maximises space right through to the land division, demolition of existing property and construction of your new dwellings. Property development isn’t just for the experts ... let us take care of the hard work and guide you through the whole process!
What do I need to do to get started? Call us on 8292 7299 to make an appointment.
All you need to bring is your Title of Land. You can obtain this from the Lands Titles Office or we can arrange it for you.
The first step in developing a property is evaluating your land and developing a concept that
not only maximises this space but ensures the design is compliant with council requirements.
In order to do this a building consultant will meet with you to discuss your various options. We
then employ the services of a professional architect to design the plans in accordance with
council requirements. Finally the plans for your development are drafted. Note: A small fee is
payable for this service. To view examples of various developments click here >>
Meet with building Consultant
You meet with one of our trained consultants to discuss the various options available for your proposed development.
You are required to bring a copy of your Land Title to this meeting. This can be obtained from the Lands Titles Office or we can source it for you.
Professional design servies
A professional designer is employed to design concept plans ensuring the development achieves maximum return for your land.
Complying with council requirements
Concept palns are checked with council planners to ensure they comply with council requirements.
Note: At this stage only verbal approval is granted.
When sub-dividing your land you have two options;
Torrens Title or Community Title Divisions
The subdivision process comprises of three basic elements;
A proposal plan is prepared and lodged electronically via the EDALA System with the Development Assessment Commission (DAC)
The DAC forwards the application to the Council, SA Water and any other government department that may have an interest in the development (ie Transport SA, Health Commission etc)
The Council will examine the application and check its compliance against the development plan for the area.
Most applications are not instantly complying, and usually they are approved on their merits and subject to certain conditions. In the majority of cases council needs to be provided with building plans that set out the basics; setbacks, private open space, carparking, site coverage.
It is important to note that in order to retain an existing house on the site and build a second dwelling , the developer must satisfy the councils requirements for both dwellings, and the best approach is to deal with the planning issues for the existing house first because addressing these issues are usually trickier. The Council may also request more information about other issues pertaining to the application during this stage. The developer must ensure this information is provided to the council as quickly as possible ie- significant trees, internal layout of the existing house on site etc.
The basic conditions of Approval from Council will be:
Demolish the existing structures on site.
Pay the DAC Reserve Fund Contribution.
Advice to the Developer that they must construct dwellings on the new allotments in accordance with the approved building plans (if the planning application was lodged as part of a request for more information by council).
Complete the Certified Survey and provide plans as required for lodgment in the Lands Titles Office (LTO).
SA Water will examine the Land Division Application. Generally there are only three requirements:
Payment of the SA Water capital contribution for each additional allotment created by the Land Division
Provide SA Water with the final survey plan, showing the required location of the new water meter.
Demolish the existing house or if the existing house is to remain make alterations to the existing house drains if those drains cross over the new boundary
Sometimes the existing meter needs to be shifted and in this case additional fees are required to be paid.
All the funds required to complete the Land Division are required to be paid to Property Conveyancers Trust Account
Demolish all existing structures on the site
Alter the internal house drains if required by SAWater (Property Conveyancer has a plumber that carries out this work for our clients if required)
Property Conveyancer will;
Upon receipt of the Section 51 Certificate of Approval, Property Conveyancer will lodge the Plan of Division in the LTO with a request for the examination of the plan.
Provided the Developer has returned the executed legal documentation, Property Conveyancer will forward the documents to the mortgagee for their consent to the Land Division.
Property Conveyancer will then book the mortgagee to attend at the Lands Titles Office and produce the original certificate of title. The legal documentation will be lodged in the LTO together with the original title and banks consent.
The LTO will now proceed to examine and then approve the Plan of Division.
When the plan is approved the LTO will examine and then approve the legal documentation.
When both the Plan & Documents are approved, the LTO will then Deposit the Plan
When the plan is Deposited the Land Division process is finished in a legal sense, because when the plan deposits the new allotments are legally created.
New titles will now issue in due course and they will be returned to the Bank or to Property Conveyancer when there is no mortgage.
When the plan is deposited, any settlements that are pending can occur and in some cases where new titles are a condition of the finance approval to construct the houses, construction can commence.
Property Conveyancer can attend to any requirements the Developer may have to sell and settle the Sales of the New Dwellings.
Buy taking advantage of our full development service we are able to guide you through every stage of developing a site, including the demolition of existing buildings.
As part of the demolition process we employ a professional demolition company to coordinate all approvals & disconnections at an early stage. This ensures that you will not face lengthy delays when you are ready to go to site.
Demolition site approval
Quotation will include the total demolition, removal and disposal of:
We are able to remove, transport & dispose of asbestos materials in accordance with Safework SA, E.P.A, Council & State regulations
Approvals & Disconnections
As part of the service the demolishers will arrange:
It is important that these approvals & disconnections are completed early in your development.
After your final plans are completed, you will meet with your building consultant to discuss various items you wish to have included in your final quote.
Upon your approval of the final quote the Council Administration Process will begin. During this time you are able to commence the selections process in preparation for the construction of the dwellings in your development.
Sales Process
Inclusions confirmed & final quote supplied. Final plans are completed.

|
Council Administration Process |
Selections Process |

Construction of your development begins.
|
Please click on the layouts below to view an example block plan. |
|